| Sitework |
Liberty Property Trust entrusted Conewago to design and build a 1,700,000 SF distribution center on their 142-acre property in Hagerstown, Maryland as part of Phase I. During this phase, some of the severe site challenges Conewago had to overcome with environmentally sensitive solutions were 1,200,000 cubic yards of earth and rock moved to balance the site, 200,000 cubic yards moved monthly to maintain schedule; 180,000 tons of excavated rock crushed onsite with much reused as stone base material; over 30,000 cubic yards of concrete produced onsite with Conewago’s portable concrete plant; and 11.4 acres of roller compacted concrete paving reduced heat island effect, oil consumption and costs.