Tilt-up Concrete

Conewago Tilt-Up ConcreteThe art of Tilt-Up concrete construction is ideal for clients seeking the following advantages:

Conewago Tilt-Up ConcreteFast Track Delivery-Our experience with Tilt-up allows us to predict that you will finish your project some 60 to 180 days ahead of the schedule of other building methods. Our tilt-up panel production techniques produce modular panels at a pace that can never be achieved by other building methods. Early Owner occupancy is achieved as project phases overlap and are condensed.

Creativity and Efficiency Can Go Hand-in-Hand-Once you have settled on an exterior design and footprint, a wide array of design aesthetics can be achieved with color, reveals, decorative accents, and textures.

Weather Delays­­-With quicker construction on site, our craftsmen and trades progress faster and in a more protected environment with less delay. A better work environment means higher quality and a savings in time and money.

Cost Containment-There is less risk because project variables are controlled through all phases. There is less cost due to labor, material, and carrying cost savings. The structure itself is more open and eliminates redundancy of systems. Bottom line, Tilt-up creates tremendous owner value from day one.

Durability-Fire resistance ratings of up to four hours wall systems are not susceptible to hail storms, rot, or rodent damage. Sound absorption and open comfortable work environment created.

Sustainability-Increased thermal mass of concrete construction achieves operational savings in heating and cooling, less daily and preventative maintenance needed, as well as the “built to last a century” nature of concrete construction.

Conewago Enterprises has answered Client’s goals with over 5 million square feet of Tilt-up construction. Projects have ranged from over 80,000 sq ft of medical facilities at Hillside (Phase I), to a 16,000 sq ft regional bank operations center, to over 800,000 sq ft in a distribution center.

Contact: Andy Feeser