Suzuki at Mechanicsburg, PA

  • Total site preparation for 127,164 SF distribution center
  • 140,000 CY of excavation
  • 10,000 SY of asphalt paving
  • 3,000 LF of storm sewer and sanitary sewer piping
  • 1,350 LF of water main piping