Town of Emmitsburg WWTP

Town of Emmitsburg WWTP

▪ The Town of Emmitsburg WWTP project consisted of the construction and installation of a new mechanical screen system, a grit removal system, an aeration lagoon system, clarifiers, a chemical system, denitrification filters, a U.V. system, and a centrifuge.
▪ General Construction
▪ Designed Flow: 0.98 MGD, Peak Flow: 2.82 MGD

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"62516":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"62516":{"val":"var(--tcb-color-2)"}},"gradients":[]}}]}__CONFIG_colors_palette__
Work With Us