Penn Township

Penn Township

▪ Penn Township project was the conversion of a chlorine contact tank to a UV System requiring: demolition/rehabilitation of existing concrete chlorine tanks, modifications to existing utility water system, reaeration diffusors, and electrical system, construction of new concrete channels for (2) UV systems, construction of new metal building over the existing tanks, installation of new UV System, gates, grating, and integration of new controls with existing plant system; with existing filter system remained operational through duration of construction
▪ General Construction
▪ Peak Flow – 14 MGD

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"62516":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"62516":{"val":"var(--tcb-color-2)"}},"gradients":[]}}]}__CONFIG_colors_palette__
Work With Us