Hub One – 400,000 SF

Hub One - 400,000 SF

▪ Hub One located in Greencastle, PA was designed to be a LEED Certified project. As a result of Conewago in-house performing the sitework, concrete, and steel the project completion date was 3 months ahead of schedule. Crews drilled and blast over 100,000 yd3 of rock to bring the site to grade, this rock was then crushed and used as a stone base.
▪ Design-Build
▪ 400,000 SF of Warehouse Facility with 90,000 SF Freezer/Cooler Storage
▪ Structured with 400,000 SF of tilt-up concrete walls & conventional steel