First Church of God 09-27-07 Pic13
First Church of God 09-27-07 Pic12
First Church of God 09-27-07 Pic00
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
OLYMPUS DIGITAL CAMERA
{"arrow":"true","pagination":"false","speed":"1000","autoplay":"true","autoplay_speed":"3000","loop":"true","flex_animation":"fade","flex_slide_to_show":"1","flex_max_slide_to_show":"1","flex_slide_to_scroll":"1","flex_slide_margin":"0","flex_slide_width":"0","flex_start_slide":0,"flex_ticker_hover":"true","flex_height_auto":"false","show_thumbnail":"false","flex_random_start":"false","caption":"false","flex_slider_mode":"horizontal"}
{"animation_fancy":"zoom","transition_fancy":"fade"}
First Church of God, Middletown
▪ First Church of God located in Middletown, PA, was the construction of an addition including a multi-purpose room and education area; of which Conewago completed within 181 days and a month ahead of schedule.
▪ Design-Build
▪ 13,828 SF Addition
▪ Structured with conventional steel & insulated precast concrete walls