Manufacturing Addition | 64,724 SF | Elsner Engineering | Hanover, PA

Elsner Engineering Works Inc.

This project is a conventional steel structure used as a manufacturing facility.

  • Contract duration was 7 months to substantial completion.
  • Design-build, Industrial
  • Completed in 2021