Hampstead WWTP 10-05-21 Pic12
Hampstead WWTP 10-05-21 Pic51
Hampstead WWTP 10-05-21 Pic49
Hampstead WWTP 10-05-21 Pic41
{"arrow":"true","pagination":"false","speed":"1000","autoplay":"true","autoplay_speed":"2500","loop":"true","flex_animation":"fade","flex_slide_to_show":"1","flex_max_slide_to_show":"1","flex_slide_to_scroll":"1","flex_slide_margin":"0","flex_slide_width":"0","flex_start_slide":0,"flex_ticker_hover":"false","flex_height_auto":"false","show_thumbnail":"false","flex_random_start":"false","caption":"false","flex_slider_mode":"horizontal"}
{"animation_fancy":"zoom","transition_fancy":"fade"}
Hampstead Waste Water Treatment Plant
Originally constructed in 1970 by Conewago, we recently completed the following: upgrades to the influent structures with grit and screening systems, oxidation ditch with aeration equipment, new control building, inline type ultraviolet disinfection system, effluent continuous backwash sand filters, chemical feed systems, process piping and valves, controls and instrumentation.
- Enviornmental, WWTP
- Completed in 2021