Capital Region Water 12-03-18 Pic39
Capital Region Water 02-20-18 Pic08
Capital Region Water 03-13-18 Pic30
Capital Region Water 03-13-18 Pic37
Capital Region Water 04-20-18 Pic04
Capital Region Water 04-20-18 Pic05
Capital Region Water 04-20-18 Pic22
Capital Region Water 12-03-18 Pic05
Capital Region Water 12-03-18 Pic27
Capital Region Water 12-03-18 Pic31
Capital Region Water 12-03-18 Pic34
Capital Region Water 12-03-18 Pic38
{"arrow":"true","pagination":"false","speed":"1000","autoplay":"true","autoplay_speed":"2500","loop":"true","flex_animation":"fade","flex_slide_to_show":"1","flex_max_slide_to_show":"1","flex_slide_to_scroll":"1","flex_slide_margin":"0","flex_slide_width":"0","flex_start_slide":0,"flex_ticker_hover":"false","flex_height_auto":"false","show_thumbnail":"false","flex_random_start":"false","caption":"false","flex_slider_mode":"horizontal"}
{"animation_fancy":"zoom","transition_fancy":"fade"}
Capital Region Water WWTP – Harrisburg, PA
Located in Harrisburg, PA, the Capital Region Water WWTP construction project consisted of the building of a new advanced water treatment facility.
- (2) 80-MGD mechanical bar screens
- 72’’ motor activated slide gates
- Washer/compactor & load out bay
- Design Flow – 38 MGD
- Peak Flow – 80 MGD