Capital Region Water WWTP – Harrisburg, PA

Capital Region Water WWTP – Harrisburg, PA

Located in Harrisburg, PA, the Capital Region Water WWTP construction project consisted of the building of a new advanced water treatment facility.

- (2) 80-MGD mechanical bar screens
- 72’’ motor activated slide gates
- Washer/compactor & load out bay
- Design Flow – 38 MGD
- Peak Flow – 80 MGD