Capital Region Water WWTP – Harrisburg, PA

Capital Region Water WWTP – Harrisburg, PA

Located in Harrisburg, PA, the Capital Region Water WWTP construction project consisted of the building of a new advanced water treatment facility.

- (2) 80-MGD mechanical bar screens
- 72’’ motor activated slide gates
- Washer/compactor & load out bay
- Design Flow – 38 MGD
- Peak Flow – 80 MGD

__CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"62516":{"name":"Main Accent","parent":-1}},"gradients":[]},"palettes":[{"name":"Default Palette","value":{"colors":{"62516":{"val":"var(--tcb-color-2)"}},"gradients":[]}}]}__CONFIG_colors_palette__
Work With Us