This structure is a pre-engineered metal building with insulated precast concrete wall panels and insulated metal panels (IMP).
- 135,250 SF addition to existing manufacturing facility in Phase 2
- Sitework including bringing rail service to the facility in Phase 3
- Completed in 2021