American Mint 05-18-12 Pic05
American Mint 05-18-12 Pic22
American Mint 06-29-12 Pic12
American Mint 11-06-12 Pic01
American Mint 10-04-11 Pic39
Amercian Mint 10-17-11 Pic12
Amercian Mint 10-17-11 Pic33
Amercian Mint 10-17-11 Pic38
American Mint 01-05-12 Pic04
American Mint 05-18-12 Pic64
American Mint 05-18-12 Pic78
American Mint 05-18-12 Pic96
American Mint 05-18-12 Pic98
American Mint 06-29-12 Pic06
American Mint 06-29-12 Pic11a
American Mint 07-14-11 Pic04
American Mint 10-04-11 Pic28
American Mint 10-04-11 Pic47
{"arrow":"true","pagination":"false","speed":"1000","autoplay":"true","autoplay_speed":"3000","loop":"true","flex_animation":"fade","flex_slide_to_show":"1","flex_max_slide_to_show":"1","flex_slide_to_scroll":"1","flex_slide_margin":"0","flex_slide_width":"0","flex_start_slide":0,"flex_ticker_hover":"true","flex_height_auto":"false","show_thumbnail":"false","flex_random_start":"false","caption":"false","flex_slider_mode":"horizontal"}
{"animation_fancy":"zoom","transition_fancy":"fade"}
American Mint - 58,927 SF
▪ American Mint located in Mechanicsburg, PA is a distribution center, with a 3-story office area and a closed parking garage. The building pad was “stepped” into the hill because the site was sloped 70’ from front to rear. Approximately 26,000 yd3 of earth was moved with over half requiring haul offsite arrangements. Substantial project completion was achieved 7 weeks ahead of schedule.
▪ Modified Design-Build
▪ 58,927 SF Distribution Center, 19,558 SF 3-story Office area, & 7,920 SF Closed Parking Garage
▪ Structured with conventional steel & precast concrete wall