Suzuki

  • Contract Type: Design-Build
  • Structural: Conventional steel with tilt-up concrete
  • 127,164 SF distribution center, classrooms and sales office
  • Project required 50 tilt-up panels
  • The tallest panel measuring 38′-7” ant the heaviest pick weighing 120,875 lbs.