Hillside Medical Center (Phases I and II) – Hanover, PA

  • Contract Type:
  • Phase I: Modified Design-Build
  • Phase II: Design Build
  • Structure:
  • Phase I:  Building structure is load bearing tilt-up concrete wall system.
  • Phase II: Building structure is load bearing precast wet coat system, and precast plank flooring.
  • Phase I: 79,164 SF Medical facility includes, physicians offices, a radiology facility, and a wellness center with an indoor swimming pool.
  • Phase II: 60,000 SF Medical facility includes, Surgery Center, Foot and Ankle, Ophthalmologist, Internists, and Senior Day Care
  • Construction completed – right on schedule