Sysco Foods – Harrisburg, PA

  • Contract Type: Design-Build
  • Structure: Conventional steel
  • 68,800 SF freezer/cooler/beverage expansion
  • Construction completed within 255 days – finished ahead of schedule
  • Contract price was on a “guaranteed not to exceed basis” so both Conewago and Sysco shared in the saving