323true dots bottomright 150true false 800none
  • 5000 fade false 60 bottom 30 http://www.conewago.com/wp-content/themes/wp-framework/images/homeslider/Conewago002.jpg
  • 5000 fade false 60 bottom 30 http://www.conewago.com/wp-content/themes/wp-framework/images/homeslider/Conewago003.jpg
  • 5000 fade false 60 bottom 30 http://www.conewago.com/wp-content/themes/wp-framework/images/homeslider/Conewago004.jpg
  • 5000 fade false 60 bottom 30 http://www.conewago.com/wp-content/themes/wp-framework/images/homeslider/Conewago005.jpg
  • 5000 fade false 60 bottom 30 http://www.conewago.com/wp-content/themes/wp-framework/images/homeslider/Conewago006.jpg
  • 5000 fade false 60 bottom 30 http://www.conewago.com/wp-content/themes/wp-framework/images/homeslider/Conewago008.jpg
  • 5000 fade false 60 bottom 30 http://www.conewago.com/wp-content/themes/wp-framework/images/homeslider/Conewago012.jpg
  • 5000 fade false 60 bottom 30 http://www.conewago.com/wp-content/themes/wp-framework/images/homeslider/Conewago014.jpg
  • 5000 fade false 60 bottom 30 http://www.conewago.com/wp-content/themes/wp-framework/images/homeslider/Conewago016.jpg
  • 5000 fade false 60 bottom 30 http://www.conewago.com/wp-content/themes/wp-framework/images/homeslider/Conewago019.jpg
Print Friendly

St. Patrick’s Cathedral Interior Renovations – Harrisburg, PA

  • St. Patrick's Cathedral Interior Renovations - Harrisburg, PA
  • St. Patrick's Cathedral Interior Renovations - Harrisburg, PA
  • St. Patrick's Cathedral Interior Renovations - Harrisburg, PA
  • St. Patrick's Cathedral Interior Renovations - Harrisburg, PA

Contract Type: Design-Build Construction Management

Performed a complete interior renovation to the existing Nave, including the following:

  • Repair plaster
  • Re-gilding and repainting walls and ceilings
  • Cleaning of existing murals
  • Refinish the covered up marble floors
  • Clean all marbles on the walls
  • Install new hardwood floors under the pew area
  • Construct a new handicap ramp
  • Install a new sound system
  • Refinish all woodwork
  • Add 4 new murals of the Saints behind the altar
  • Install new tracery in the five arches behind the altar
  • Modify and relocate the Tabernacle, Cathedra, and Ambo
  • Clean and repair Scagliola columns
  • Installed new HVAC system in the lower level
  • Installed a new fire alarm system
  • Installed a new handicap restroom
A Commitment to Excellence