Hub One Logistics

Hub-One-06-26-14-Pic29-web

Armada Supply Chain Solutions is a leading food service supplier for several large fast food industries such as McDonald’s, Darden Restaurants, Chipotle and Chik-fil-a. They needed a new centralized distribution facility that would become their northeast hub. Conewago designed and constructed his 400,000 SF distribution center includes 90,000 SF of freezer / cooler area and achieved LEED silver certification.

  • 100,000 CY of rock crushed onsite and reused for stone base
  • Five parking spaces for low-emitting and fuel-efficient vehicles
  • Six bicycle storage facilities with showers
  • Five preferred parking spaces for car/vanpool vehicles
  • Storm water runoff from 90% of the average annual rainfall is captured or treated
  • 142.01% of the base building roof surface has a White Solar Reflectance Index
  • 39.92% Reduction on potable water usage in the project
  • hubonelogistics_4photoLandscaping designed for no irrigation
  • Energy cost savings of 36.66% using the ASHRAE 90.1-2007
  • Project has diverted 95.05% of the on-site generated construction waste from landfill
  • 24.41% of the total building materials content, by value, has been manufactured using recycled materials.
  • 27.51% of the total building materials and products that have been manufactured and extracted within 500 miles of the project site.
  • Lighting controls are provided to enable 100% of occupants to make adjustments to suit individual task needs and preferences.