Hub One – Greencastle, PA

  • Contract Type: Design-Build
  • Structure: 400,000 SF tilt-up concrete and conventional steel dry goods warehouse including a 90,00 SF freezer/ cooler
  • Crews drilled and blasted over 100,000 CY of rock to bring the site to grade. This rock was crushed onsite and re-used as stone base.
  • Our in-house site, concrete and steel crews’ hard work allowed for beating the project schedule by 3 months
  • LEED Certified project