Amazon.com – Lewisberry, PA

  • Contract Type: Design-Build
  • Structure: Conventional steel with tilt-up concrete wall panels
  • 705,000 SF distribution Center
  • We subsequently constructed a 797,500 SF twin facility on the adjacent lot
  • Sitework: Cut 500,000 CY of excavation of which 33% was solid rock
  • Our mobile batch concrete plant produced over 600 cubic yards of concrete daily
  • Construction was completed in 12 months – right on schedule