Shelter Systems – Westminster, MD

  • Contract Type: Design-Build
  • Structure: Insulated precast wall panels
  • 131,194 SF manufacturing facility consists of 120,000 SF truss assembly building and 11,194 SF office/administration area
  • Design of facility enabled them to improve production of trusses by 40% and use expandable endwall to accommodate future growth
  • Construction was completed within just 7 months
  • Site includes 7 acres of our pervious pavement, Porous Pave